■ OSHA 1910 General Industry

OSHA 1910 in an operating data center.

1910 governs the facility once it is running. Nearly every subpart touches a data center somewhere — and the ones people forget are rarely the electrical ones.

The dividing line

General industry (1910) applies to operations and maintenance. Construction (1926) applies to construction, alteration and repair. On a live campus with an active build-out, both apply at the same time on the same property — which is why the boundary between them is one of the most consequential things to get right. More on that →

§ What 1910 covers here

The maintenance / construction line is not always obvious

Replacing a breaker like-for-like is maintenance. Adding a new distribution section, running new feeders or building out a new data hall is construction. When a task sits on the line, the practical answer is to apply whichever standard is more protective and document why.

§ Subpart by subpart

SubpartTopicWhere it lands in a data center
DWalking-working surfaces — 1910.22–.30Rooftop chillers and CRAH units, catwalks over data halls, cable tray access, generator radiator platforms, unprotected roof edges. Detail →
EExit routes and emergency planning — 1910.36–.39Badge-controlled egress, mantraps, fail-safe vs fail-secure door hardware, exits blocked behind cage build-outs
GNoise — 1910.95Generator load bank testing, fan walls, chiller plant. Hearing conservation program triggers at 85 dBA TWA
HHazardous materials — 1910.101–.126Diesel fuel farms and day tanks, glycol, refrigerants, battery electrolyte
HConfined spaces — 1910.146Electrical vaults, valve pits, cooling tower basins, thermal storage tanks. Detail →
HLockout/tagout — 1910.147The energy control program. Detail →
IPPE — 1910.132–.140Written hazard assessment certification, Class E hard hats, EH footwear, rubber goods. Detail →
JSigns and tags — 1910.145Accident prevention signs, arc flash labelling interaction
KMedical and first aid — 1910.151AED program, and eyewash within 10 seconds of flooded battery rooms — 1910.151(c)
LFire protection — 1910.155–.165Clean agent discharge and occupant safety, pre-action systems, VESDA, fire watch during impairment
NMaterials handling — 1910.176–.184Server and rack delivery, dock operations, powered industrial trucks, battery cabinet moves, rack tip-over
OMachine guarding — 1910.212–.219Fan wall guarding, cooling tower drives, belt guards, CRAH rotating parts
QWelding and hot work — 1910.251–.255Hot work permits inside a live facility, fire watch, suppression impairment
SElectrical — 1910.301–.399The core. Installation safety and safety-related work practices. Detail →
ZToxic and hazardous substancesHazCom 1910.1200, lead 1910.1025 (battery terminals), silica 1910.1053 (concrete coring), bloodborne pathogens 1910.1030

§ The five that generate findings

01

1910.147 energy control. Procedures that do not match the equipment, or annual inspections that were never done.

02

1910.132(d) hazard assessment. The written certification does not exist. This one is cheap to fix and frequently missing.

03

1910.37 exit routes. Egress blocked by cage build-out, staged equipment or cabling.

04

1910.151(c) eyewash. No eyewash within 10 seconds of a flooded battery room, or one that has never been flushed.

05

General Duty Clause 5(a)(1) for arc flash — because there is no general industry arc flash standard, so OSHA reaches for NFPA 70E. How that works →

OSHA sets the requirement. 70E is the method.

Train to the standard OSHA measures you against

Every class maps 70E requirements back to the OSHA sections they satisfy.