■ OSHA 1926 Construction

OSHA 1926 — the phase where most people get hurt.

Gigawatt campuses are going up faster than the workforce building them can be qualified. Construction is where the fatality data actually is — and on a live campus it happens on the other side of a wall from energized equipment.

When it applies

1926 covers construction, alteration and repair. New build, fit-out, expansion, and any structural or system modification. Routine maintenance of the running facility is 1910. On an operating campus with an active build-out, both apply simultaneously — and the boundary between them is a real management problem, not a paperwork one.

§ Subpart by subpart

SubpartTopicData center relevance
CGeneral safety and health — 1926.20–.35Accident prevention program, training, competent persons, EAP
DOccupational health and environmental controls — 1926.50–.66First aid, sanitation, noise, lead, HAZWOPER
EPPE — 1926.95–.107Including 1926.97 electrical protective equipment
FFire protection and prevention — 1926.150–.155Combustible storage on a live campus
GSigns, signals and barricades — 1926.200–.203Separating construction from operating space
HMaterials handling and storage — 1926.250–.252Laydown, staging, rigging loads
ITools — 1926.300–.307Including powder-actuated tools
JWelding and cutting — 1926.350–.354Hot work adjacent to live space
KElectrical1926.402–.449Temporary power is the number one electrical finding. Detail →
LScaffolds — 1926.450–.454
MFall protection1926.500–.5036-foot trigger, leading edge, roof and steel. Detail →
NHoists, elevators and conveyors — 1926.552Material and personnel hoists
OMotor vehicles and mechanized equipment — 1926.600–.606Struck-by on a site with hundreds of pieces of mobile equipment
PExcavations — 1926.650–.652Duct bank and utility trenching. Enormous scope on greenfield campuses
QConcrete and masonry — 1926.700–.706Core drilling and slab penetrations
RSteel erection — 1926.750–.761
TDemolition — 1926.850–.860Decommissioning and data hall refit
VElectric power transmission and distribution — 1926.950–.968Building the substation and the utility tie
XStairways and ladders — 1926.1050–.1060
AAConfined spaces in construction — 1926.1200–.1213Vaults, pits and tanks during construction
CCCranes and derricks1926.1400–.1442Generator, chiller and transformer picks. Detail →
ZToxic and hazardous substancesSilica 1926.1153 during coring and cutting

§ The five that matter most on a data center project

01

Temporary power1926.404(b)(1). GFCI or an assured equipment grounding conductor program. This is the highest-volume electrical finding in construction, full stop.

02

Fall protection1926.501. Six feet, leading edge, roof work, steel. Consistently in OSHA's most-cited list.

03

The energization boundary — when construction gear becomes live gear. The single most dangerous transition in the building's life.

04

Multi-employer liability — creating, exposing, correcting, controlling. With a dozen subs on site, this determines who gets cited.

05

Critical lifts1926.1400. Generators, chillers and transformers, frequently near energized overhead lines.

Construction and operations, same campus

Training for both sides of the wall

NFPA 70E for the electrical crews, and full-practice EHS breadth for everything else on the project.