Hillsboro packs 35 data centers into one suburb — more than any city in Oregon — at 0.2% vacancy, the tightest of any US market. In July 2026 its city council passed Oregon's first moratorium on new data center and BESS applications, a 120-day pause that tells you exactly how fast this market ran.
The market right now
Enterprise-zone tax abatements and PGE power built the cluster; the urban growth boundary caged it. What's left is expansion inside the fence line — NTT building toward 354 MW, seven-plus projects grandfathered through permitting — and battery storage prominent enough that the moratorium names it. Oregon runs its own OSHA plan and one of the strictest electrician licensing regimes in the country.
- 475.4 MW inventory at end of 2025 (CBRE H2 2025)
- Vacancy 0.2% — roughly 1.0 MW available in the entire market (CBRE H2 2025)
- Inventory grew 334% from 2020 to 2025 (CBRE press release 2025)
- Asking rents $175-225/kW/month (CBRE H2 2025)
- Hillsboro hosts 35 data centers — more than any Oregon city — with at least 7 more under construction or in permitting (OPB, July 2026)
- Portland metro overall: ~64 facilities and ~1,125 MW of power capacity (Baxtel 2026)
Every campus on the map
Solid copper markers are operating campuses; white markers are under construction; dashed outlines are announced or planned. Locations are approximate campus-level centroids compiled from public sources — county records, operator announcements, and market reports — as of August 2026. Dense clusters are grouped. Corrections are welcome through the contact page.
Operating campuses mapped
- NTT Hillsboro campus — NTT Global Data Centers · Hillsboro. Flagship US West campus; 354 MW total planned capacity with 216 MW in expansion (CBRE H1 2025)
- Digital Realty PDX — Digital Realty · Hillsboro. PDX11 alone is 553,000 sq ft (Baxtel 2026)
- Flexential Hillsboro campuses — Flexential · Hillsboro. Multiple Hillsboro sites; market's longest-tenured local operator
- QTS Hillsboro — QTS · Hillsboro. 248 MW operational across 5 Oregon sites (Baxtel 2026)
- Stack PDX campus — Stack Infrastructure · Hillsboro. Hyperscale campus in the Hillsboro cluster
- Aligned PDX-01 — Aligned Data Centers · Hillsboro. 480,000 sq ft facility (Baxtel 2026); pursuing BESS with Calibrant Energy (CBRE H2 2025)
- EdgeConneX Hillsboro — EdgeConneX · Hillsboro. Multi-building edge/hyperscale site in the cluster
- AWS Troutdale — Amazon Web Services · Troutdale. Hyperscale buildings at Troutdale Reynolds Industrial Park, east metro
- Google The Dalles — Google · The Dalles. Google's first company-built data center (2006), on the Columbia River; currently being updated (CBRE H1 2025)
Under construction & planned
- Flexential Hillsboro 6 — Flexential · Hillsboro · planned. 350,000 sq ft two-story facility announced (CBRE H2 2025)
- NTT expansion — NTT Global Data Centers · Hillsboro · under construction. 216 MW additional capacity toward 354 MW campus total (CBRE H1 2025)
- QTS Hillsboro expansion — QTS · Hillsboro · planned. Large additional campus phases planned (DCD)
- Aligned BESS colocation — Aligned / Calibrant Energy · Hillsboro · planned. Battery energy storage deployment partnership (CBRE H2 2025)
- Hillsboro permitting pipeline — Multiple · Hillsboro · under construction. At least 7 sites under construction or in permitting; pre-moratorium applications unaffected (OPB, July 2026)
- AWS Eastern Oregon expansion — Amazon Web Services · Morrow/Umatilla Co. (outside metro) · planned. 400 additional acres acquired Feb 2025 (CBRE H1 2025); note: Meta Prineville and Apple sit in Central Oregon, a separate cluster
Power
Service territory: Portland General Electric (PGE) · Northern Wasco County PUD (The Dalles).
- Hillsboro City Council enacted Oregon's first 120-day moratorium on new data center AND BESS land-use applications, July 27 2026 (OPB)
- Oregon POWER Act (HB 3546, 2025) created a separate rate class for 20 MW+ data center customers to shield residential ratepayers (CBRE H2 2025)
- PGE plans $6.5B in clean energy investment and is using GridCARE grid-planning to accelerate hundreds of MW of data center capacity (CBRE H2 2025; PGE/GridCARE 2026)
- Transmission constraints plus the urban growth boundary keep supply scarce; BESS colocation emerging (Aligned/Calibrant partnership, CBRE H2 2025)
The regulatory picture
Enforcement. Oregon OSHA is a state plan (under DCBS) with its own rules and penalty structure, historically stricter and more inspection-active than federal OSHA
Licensing. Oregon has one of the strictest state regimes: BCD-issued licenses (general journeyman, supervising electrician, limited classes) with enforced CEU and supervision requirements
Also in play. Enterprise-zone property tax abatements built the Hillsboro cluster; the July 2026 moratorium and pending development-code amendments now gate new projects; no state sales tax
What it means for the work
This is the market where regulatory literacy earns its keep: Oregon OSHA's rules, BCD license classes with enforced supervision ratios, and a BESS pipeline that makes Article 360 and NFPA 855 fluency table stakes for anyone bidding electrical work.
Oregon OSHA is a state plan with its own electrical rules and one of the nation's strictest electrician licensing regimes — training must map to state requirements
BESS is prominent enough here that the city's 2026 moratorium explicitly covers it — Article 360/NFPA 855 stored-energy competence is a differentiator
0.2% vacancy forces density upgrades inside live facilities — energized-work justification discipline under 70E 110.2(B)
Semiconductor fabs and data centers compete for the same Washington County electrical workforce, stretching qualified-person coverage
Market context is half the picture. The other half is the decision walk — the nine questions the 2027 edition asks before anyone opens a door on energized gear. Run it against the task, then check the room pages in the Data Center Application Series.
NFPA 70E classes taught on the 2027 edition, against data center topology, about 55 times a year — live virtual weekly, and private onsite days in Hillsboro run against your one-lines for crews of 15 or more.