Reno / Tahoe-Reno.
The Tahoe Reno Industrial Center is the biggest industrial park in America, and it is filling with gigawatts: NV Energy has committed up to 4,000 MW to data centers in greater Reno, with the $4.2B Greenlink transmission project adding roughly 5,000 MW of headroom. Nevada runs its own OSHA plan — and has no statewide journeyman electrician license.
The market right now
Switch's Citadel campus set the template in 2017; now Vantage's $3B NV1, EdgeCore, Novva, Tract's ~2 GW master plan and PowerHouse's twin campuses are stacking up behind it, with geothermal PPAs and a proposed 1,800 MW gas station near Fernley feeding the load. Nearly everything at TRIC hits energization and commissioning between 2026 and 2028 — the highest-risk phase of a data center's electrical life.
- NV Energy has committed up to 4,000 MW to data center customers in greater Reno; Greenlink North+West transmission adds ~5,000 MW at an estimated $4.2B (Nevada Current, 2026)
- Switch's Citadel Campus at the Tahoe Reno Industrial Center opened 2017 with a 1.3M sq ft first building; campus master-planned up to 7.2M sq ft (Switch, 2017)
- Tract is master-planning a ~2 GW data center park in Storey County with NV Energy power deliveries beginning 2026 (Data Center Frontier, 2025)
- Vantage is investing $3B in its 224 MW NV1 AI campus at TRIC (Vantage/BusinessWire, 2025; DataCenterMap)
- Apple has operated at Reno Technology Park since 2012 and announced a $1B expansion in 2018 (Construction Dive, 2018)
- Google announced a $400M Nevada expansion including its Storey County site in Sept 2024 (Carson Now, 2024)
Every campus on the map
Solid copper markers are operating campuses; white markers are under construction; dashed outlines are announced or planned. Locations are approximate campus-level centroids compiled from public sources — county records, operator announcements, and market reports — as of August 2026. Dense clusters are grouped. Corrections are welcome through the contact page.
Operating campuses mapped
- Switch Citadel Campus — Switch · TRIC / McCarran, Storey Co.. Open since 2017; master plan up to 7.2M sq ft / ~650 MW (Switch, 2017)
- Google Storey County — Google · TRIC, Storey Co.. Operating since 2018; included in Google's $400M 2024 Nevada expansion (Carson Now, 2024)
- Apple Reno Technology Park — Apple · East Sparks / Washoe Co.. Operating since 2012; $1B expansion announced 2018 and further RTP expansion in 2024 (NNBW, 2024)
- EdgeCore TRIC — EdgeCore Digital Infrastructure · TRIC, Storey Co.. First capacity energized with campus plan of 1.5M sq ft / 216 MW (Data Center Frontier)
- Novva Tahoe Reno — Novva Data Centers · TRIC, Storey Co.. 60 MW facility opened late 2024 (Data Center Frontier)
Under construction & planned
- Vantage NV1 — Vantage Data Centers · TRIC / Storey Co. · under construction. $3B, 224 MW AI campus; McCarthy building (Vantage 2025; DataCenterMap)
- Tract Storey County park — Tract · TRIC, Storey Co. · planned. ~2 GW master-planned park; NV Energy deliveries from 2026 (Data Center Frontier, 2025)
- PowerHouse TRIC campuses — PowerHouse Data Centers / PA Data Center Partners · TRIC, Storey Co. · planned. Two campuses in development; reported ~$15B hub (Data Center View, 2025; Nevada Appeal, 2026)
- Switch Citadel buildout — Switch · TRIC, Storey Co. · under construction. Ongoing phases toward ~650 MW / 7.2M sq ft master plan (Switch)
- EdgeCore Building 2 — EdgeCore Digital Infrastructure · TRIC, Storey Co. · under construction. Second building toward 216 MW campus total (Data Center Frontier)
- Microsoft Storey County land — Microsoft · TRIC, Storey Co. · planned. Land acquired 2022; build timeline unconfirmed (Nevada Current, 2026)
Power
Service territory: NV Energy.
- Greenlink West rate rider approved Sept 2025 (~$4/mo in southern NV); statewide rate impacts fueling political scrutiny of data center load (Nevada Current, 2026)
- A planned ~1,800 MW natural gas station near Fernley is intended to serve data center demand (Nevada Current, 2026)
- PUCN approved NV Energy's Clean Transition Tariff enabling Google to buy Fervo geothermal for its Storey County load (NV Energy/Google, 2024)
- EdgeCore's TRIC campus is planned at 1.5M sq ft / 216 MW critical load with phased utility deliveries from H2 2025 (Data Center Frontier)
The regulatory picture
Enforcement. State plan: Nevada OSHA, under the Division of Industrial Relations (DIR), enforces workplace safety in Nevada.
Licensing. Nevada has no statewide journeyman electrician license; electrical work runs under Nevada State Contractors Board C-2 electrical contractor licenses, so worker qualification is employer-driven.
Also in play. Nevada GOED data center tax abatements (up to 75% personal property abatement) plus Storey County's fast TRIC permitting drove the cluster; incentive reform debated in the Legislature (Nevada Current, 2026).
What it means for the work
A remote high-desert park with thousands of traveling electricians rotating through means qualification records, not local custom, carry the program. With no state journeyman card, the employer's 110.4 documentation is the only thing standing between 'experienced' and 'qualified.'
Nevada OSHA state plan plus no statewide journeyman license means worker electrical qualification is employer-driven - strong case for third-party NFPA 70E training and documentation.
Multiple gigawatt-class campuses (Vantage NV1, Tract, PowerHouse, EdgeCore) hit energization and commissioning 2026-2028, the highest arc-flash-risk phase.
TRIC's remote high-desert location favors on-site training delivery; thousands of traveling electricians rotate through a single industrial park.
Greenlink substations, a planned Fernley gas plant and geothermal PPAs add utility-intertie and switchyard exposure alongside white-space work.
Market context is half the picture. The other half is the decision walk — the nine questions the 2027 edition asks before anyone opens a door on energized gear. Run it against the task, then check the room pages in the Data Center Application Series.
NFPA 70E classes taught on the 2027 edition, against data center topology, about 55 times a year — live virtual weekly, and private onsite days in Reno run against your one-lines for crews of 15 or more.